Rural Haat Modernization

Illustrative list of investments to be made and Rural Haat Modernization phasing
The ceiling of investment for each haat will be Rs. 20 Lakh for Stage I infrastructure and Rs. 30 Lakhs for Stage II infrastructure. Initial investment for Stage I infrastructure will be Rs. 20 Lakh, subsequently 10% of RHs (30 numbers) will become eligible for higher level of investment for Stage II infrastructure, i.e. Rs. 30 Lakh per RH. However, the actual investment in each haat will be demand driven based on the needs of Haat users. It will be mandatory for each Haat to make sure that basic infrastructure like covered sheds, platforms, toilets, drinking water facility, electricity is taken up for being eligible to take up Stage II infrastructure. Stage I
& Stage II infrastructure would be a combination of basic and productive infrastructure. The details of Illustrative list of infrastructure are as follows:

 
A: Basic Infrastructure
 Sr. No.
 Particulars
Read more...
Illustrative list of investments to be made and Rural Haat Modernization phasing
The ceiling of investment for each haat will be Rs. 20 Lakh for Stage I infrastructure and Rs. 30 Lakhs for Stage II infrastructure. Initial investment for Stage I infrastructure will be Rs. 20 Lakh, subsequently 10% of RHs (30 numbers) will become eligible for higher level of investment for Stage II infrastructure, i.e. Rs. 30 Lakh per RH. However, the actual investment in each haat will be demand driven based on the needs of Haat users. It will be mandatory for each Haat to make sure that basic infrastructure like covered sheds, platforms, toilets, drinking water facility, electricity is taken up for being eligible to take up Stage II infrastructure. Stage I
& Stage II infrastructure would be a combination of basic and productive infrastructure. The details of Illustrative list of infrastructure are as follows:

 
A: Basic Infrastructure
 Sr. No.
 Particulars
Approx. Total
Area / Capacity
Unit Rate
Total Rs. in
Lakh
1
Platforms with sheds for Producers
3000 Sq. ft.
Rs. 350 / sq. ft.
10.50
2
Pathways (LS)
 
LS
3.00
 
3
Drinking Water, Bore well pumping
set with taps (LS)
 
 
LS
 
1.00
4
Electricity (LS)
 
LS
1.50
5
Toilet Block
200 sq. ft
Rs. 500 / sq. ft.
1.00
6
Compound / fencing (LS)
 
LS
2.00
7
Garbage/ Solid waste Pit (LS)
 
LS
0.50
8
Watchman Cabin
100 sq ft
500/sq.ft
0.50
 
Total Cost of Basic Infrastructure
20.00

B: Productive Infrastructure
Sr.
No.
 
Particulars
Approx. Total
Area / Capacity
 
Unit Rate
Total Rs. in
Lakh
1
Godown
500 MT
Rs.2,000 / MT
10.00
 
2
 
Small Cold Storage
 
5 MT
Rs.1.25 Lakh / MT
 
6.25
 
3
Grading & packing unit (pack house)
for fruits & vegetables
 
1000 Sq ft
 
Rs. 400 / Sq ft
 
4.00
4
Grading, packing tables
3 No.
Rs. 25,000 / table
0.75
5
Grain Pulses Unit with Shed
1.5 MT / hr.
LS
9.00
 
Total Cost of Productive Infrastructure
30.00
 